Seaway 7 offers installation services for WTG foundations through its Heavy Lift Vessels (HLV), Seaway Strashnov and Seaway Yudin. In the last 12 years Seaway 7 has built up an extensive track record in installing a wide range of foundation types, ranging from monopiles and suction bucket jackets to tripod and pre-piled jackets using a pile installation frame. Seaway 7 successfully completed the Beatrice Project (EPCI) in 2019. Beatrice, once fully operational, will be one of Scotland’s largest offshore wind farms, located approximately 13km from the Caithness coast. All Seaway 7 vessels contributed to deliver the design, fabrication and installation of 84 jacket foundations, weighing over 120,000Te, along with 165km of Inner-Array Cables.