Torbjørn Hegdal
Business Development Manager
Technology readiness (TRL)
To optimize oil recovery, water injection (WI) is normally used as the preferred drainage mechanism. WI traditionally represents high CAPEX and early commitment with large uncertainty, before the dynamic nature of the reservoir is known.
A modular approach, moving water treatment and injection close to the subsea well head, as close to the reservoir as possible, enables a flexible, cost efficient, and robust field development with lower carbon footprint.
Identified as a Lower Emissions Oil and Gas Solution (LEOG).
Use company contact for detailed value proposition.