Cement Support Tool (CST) Reliable Off-Bottom Cement Plug Placement

Unique value proposition (UVP)

Cement Support Tool (CST) Proven Reliability - Reduced Rig Time - Significant Cost Savings.

Perigon's field-proven Cement Support Tool (CST) enables reliable and cost-efficient placement of balanced off-bottom cement plugs, significantly reducing the risk of failed operations and costly remedial work.

With more than 6,100 units supplied globally and a first-attempt success rate exceeding 98%, CST offers a proven alternative to conventional cement plug base technologies.

Industry experience indicates an average of 2.4 attempts to successfully establish a balanced cement plug using conventional methods. By improving first-attempt success, CST can substantially reduce rig time, operational costs, and non-productive time (NPT).

Operators have reported operations requiring more than a week using conventional methods, compared with approximately one day when utilizing CST.

Key Benefits

  • Achieve a 98% success rate in setting balanced off-bottom cement plugs on the first attempt, eliminating the average 2.4 attempts typically required and reducing associated costs.
  • Reduce rig time from over a week to just one day, significantly cutting expenses and increasing operational efficiency with the CST.
  • Rely on a proven solution with over 6,1000 units supplied globally, ensuring dependable performance and enhanced efficiency in cement plug operations.

Gallery

Images

Company contact

Arild Helleren
CEO
arild@perigon.no+47 901 54220

TRL scale

9
DevelopmentTech demoMature

Categories

Oil & Gas
Well construction and operations
  • Down hole technologies, fluids and services · cementing and plugs

References

  • Cement Support Tool Applications
  • Cement Support Tool Case Studies