Marwell AS
Marwell AS

TIME toe valve - chemically actuated isolation valve

Unique value proposition (UVP)

Utilizing the FADE technology Marwell have developed the TIME toe valve. The valves are installed at the end of the lower completion to control the toe zone and can be run in hole in either open or closed position. The valves can be actuated by: - Pressure activated version: with hydrostatic initiator with a pre-set actuation delay between 10 hours and 3 days. - Fluid activated version is actuated when exposed to brine or acid. When exposed to oil base mud there is no activation. The added values for customers when using TIME toe valves are: -Enables wash-pipe free running of lower completion together with dissolvable plugs - Simple and cost effective way to control toe zone - No need for intervention, electronics or to send pressure signals

Key Benefits

  • The TIME toe valve enables installation without wash-pipes, simplifying operations and reducing costs by eliminating the need for additional equipment.
  • With no requirement for intervention or electronic controls, the TIME toe valve reduces operational risks and enhances safety during well completions.
  • Offering both pressure and fluid-activated options, the TIME toe valve provides adaptable and cost-effective control for various well conditions without relying on pressure signals.

Other technologies by this company

View all
Energy SystemsOil & Gas

Tank terminal and underground cavern

+1 more categorization

Extender non-metallic lower completion

Marwell AS
TRL 7
Oil & Gas

Down hole technologies, fluids and services

+1 more categorization

FADE - Washpipe-free System for more efficient lower completion deployment

Marwell AS
TRL 9
Oil & Gas

Down hole technologies, fluids and services

+1 more categorization

Extender non-metallic tubular for open hole multi-lateral junctions

Marwell AS
TRL 9

Company contact

Petter Rommetvedt
Completion and Intervention Manager
petter@marwell-tech.no+47 476 32 085

TRL scale

6
DevelopmentTech demoMature

Categories

Oil & Gas
Well construction and operations
  • Down hole technologies, fluids and services · well completion, equipment and fluids, artificial lift

References

  • Marwell products
Norwegian Energy Partners
PrivacyPrivacy policy
ConnectLinkedIn

© Norwegian Energy Partners All Rights Reserved

NORWEP
AboutContactPlans
EventsMarketsTechnologiesPartners