Scanmudring
Scanmudring

Cable buria/deburial and landfall

Unique value proposition (UVP)

Rock size is a key factor when selecting ejector size - recommended 2 - 2,5 time expected rock size on the ejector to prevent clogging Slope/ levelling is easy with stone as the chance of backfilling is limited (as compared to sand) Usually +/-5 cm is achievable with sandy material, but tolerances for rock removal are dependent on stone size A key challenge is that removed rocks accumulate behind the machine, while transport over longer distances (in excess of 50m) will affect performance. Better performance rate can be achieved without use of exhaust hose. Usually visibility is good while dredging in rocks Rocks can be backfilled if required

Key Benefits

  • Selecting an ejector size 2 to 2.5 times the expected rock size minimizes clogging, ensuring smoother and more reliable dredging operations.
  • The system maintains clear visibility in rocky environments, enhancing operational safety and precision to reduce costly errors.
  • Eliminating the exhaust hose boosts performance for rock transport over distances greater than 50 meters, increasing efficiency.

Other technologies by this company

View all
Offshore Wind

Export cable · Installation

ScanCFE- Next Gen Controlled Flow Excavator

Scanmudring
TRL 9
Oil & Gas

Marine operations and subsea services · Imr

+1 more categorization

ROV and Standalone Dredges

Scanmudring
TRL 9
Oil & Gas

Marine operations and subsea services

+1 more categorization

Underwater drilling system

Scanmudring
TRL 9
Oil & Gas

Marine operations and subsea services

+1 more categorization

Drill cut removal

Scanmudring
TRL 9
Oil & Gas

Marine operations and subsea services

+1 more categorization

Cutting services

Scanmudring
TRL 9
Oil & Gas

Marine operations and subsea services

+1 more categorization

Grabs

Scanmudring
TRL 9
Oil & Gas

Marine operations and subsea services

+1 more categorization

Integrated services

Scanmudring
TRL 9
Oil & Gas

+2 more categorizations

Subsea excavation, construction and cutting services

Scanmudring
TRL 9
Oil & Gas

Marine operations and subsea services

+1 more categorization

Boulder Removal

Scanmudring
TRL 9
Oil & Gas

Marine operations and subsea services

+1 more categorization

Subsea cleaning services

Scanmudring
TRL 8
Oil & Gas

Marine operations and subsea services

+1 more categorization

Seabed Levelling

Scanmudring
TRL 9
Oil & Gas

Marine operations and subsea services

+1 more categorization

Debris removal

Scanmudring
TRL 9
Offshore Wind

Offshore installation

Soil Plug Removal Tool

Scanmudring
TRL 9
Offshore Wind

Offshore installation

Scour protection leveling and/or installation underneath jackets/OSS

Scanmudring
TRL 9

Scanmudring in hydro power

Scanmudring
TRL 2
Offshore Wind

Offshore installation

Interlal Pile Cleaning Tool

Scanmudring
TRL 9
Offshore Wind

Offshore installation

Filter Layer Removal Tool

Scanmudring
TRL 9

Company contact

Frank Ludvigsen
Business Development Manager
flu@scanmudring.no+47 950 03 379

TRL scale

9
DevelopmentTech demoMature

Categories

Offshore Wind
Cable
  • Export cable · installation

References

  • Company website
Norwegian Energy Partners
PrivacyPrivacy policy
ConnectLinkedIn

© Norwegian Energy Partners All Rights Reserved

NORWEP
AboutContactPlans
EventsMarketsTechnologiesPartners