Cranemaster
Cranemaster

Protection of crane and rigging during pile hammering

Unique value proposition (UVP)

Sudden free fall of the piles during pile hammering due to layering in the soil, so called pile runs or pile drops, is an increasing concern in the industry. The snap loads following pile runs can be very high, exposing both personnel and equipment to high risk. In cooperation with key players in the industry, Cranemaster has developed special shock absorbers that will reduce the snap loads to acceptable levels. As a result, risk is reduced, and expensive interruptions in the piling process avoided. Benefits: - Protection of crane and rigging against snap loads during piling. - Expensive interruptions in the piling process can be avoided.

Key Benefits

  • Protect cranes and rigging from damage by controlling snap loads during pile hammering, reducing the risk of costly repairs.
  • Prevent project delays by minimizing interruptions in the piling process, ensuring a seamless and efficient construction timeline.
  • Enhance site safety and regulatory compliance by maintaining snap loads within safe limits, safeguarding both equipment and personnel.

Other technologies by this company

View all
Oil & Gas

Platforms, floating production systems and onshore plants

+2 more categorizations

Cranemaster passive heave compensators and shock absorbers

Cranemaster
TRL 9
Oil & Gas

Marine operations and subsea services · Seabed installation

+1 more categorization

Shock absorbers and passive heave compensators

Cranemaster
TRL 9
Oil & Gas

Marine operations and subsea services

+1 more categorization

Passive Heave Compensation

Cranemaster
TRL 9
Oil & Gas

Vessels, rigs and modules

+1 more categorization

Cranemaster shock absorbers and passive heave compensators II

Cranemaster
TRL 9
Oil & Gas

Subsea equipment and services

+1 more categorization

Cranemaster Shock absorbers and passive heave compensators I

Cranemaster
TRL 9
Offshore Wind

Offshore installation

Shock absorber for pile-run protection

Cranemaster
TRL 9
Offshore Wind

Offshore installation

TP Installation

Cranemaster
TRL 9
Offshore Wind

Offshore installation

Safe deployment of large objects through the splash zone

Cranemaster
TRL 9
Offshore Wind

Offshore installation

Increased ship stability during installation from floating vessels

Cranemaster
TRL 9

Company contact

Espen Boseth Johansen
CEO
espen@cranemaster.com+47 458 68 899

TRL scale

9
DevelopmentTech demoMature

Categories

No categories.

References

  • Read more about Pile Run Protection
  • A selection of references
Norwegian Energy Partners
PrivacyPrivacy policy
ConnectLinkedIn

© Norwegian Energy Partners All Rights Reserved

NORWEP
AboutContactPlans
EventsMarketsTechnologiesPartners