Cranemaster
Cranemaster

TP Installation

Unique value proposition (UVP)

A Cranemaster can be used during the installation of the Transition Piece (TP) by providing a tension in the rigging from floating vessel, compensating for heave motions. This will make it possible to use floating vessel in stead of jack-up vessel with various advantages,

Key Benefits

  • By compensating for heave motions, Cranemaster allows the use of floating vessels instead of expensive jack-up vessels, cutting installation costs for transition pieces by a significant margin.
  • The technology boosts operational uptime by ensuring stable installations in rough sea conditions, effectively minimizing delays caused by adverse weather.
  • Cranemaster enhances safety during installation by maintaining consistent rigging tension, reducing the risk of accidents due to vessel movement.

Other technologies by this company

View all
Oil & Gas

Platforms, floating production systems and onshore plants

+2 more categorizations

Cranemaster passive heave compensators and shock absorbers

Cranemaster
TRL 9
Oil & Gas

Marine operations and subsea services · Seabed installation

+1 more categorization

Shock absorbers and passive heave compensators

Cranemaster
TRL 9
Oil & Gas

Marine operations and subsea services

+1 more categorization

Passive Heave Compensation

Cranemaster
TRL 9
Oil & Gas

Vessels, rigs and modules

+1 more categorization

Cranemaster shock absorbers and passive heave compensators II

Cranemaster
TRL 9
Oil & Gas

Subsea equipment and services

+1 more categorization

Cranemaster Shock absorbers and passive heave compensators I

Cranemaster
TRL 9
Offshore Wind

Offshore installation

Shock absorber for pile-run protection

Cranemaster
TRL 9
Offshore Wind

Offshore installation

Safe deployment of large objects through the splash zone

Cranemaster
TRL 9

Protection of crane and rigging during pile hammering

Cranemaster
TRL 9
Offshore Wind

Offshore installation

Increased ship stability during installation from floating vessels

Cranemaster
TRL 9

Company contact

Espen Boseth Johansen
CEO
espen@cranemaster.com+47 458 68 899

TRL scale

9
DevelopmentTech demoMature

Categories

Offshore Wind
Foundation
  • Offshore installation

References

  • Cranemaster heave compensator
Norwegian Energy Partners
PrivacyPrivacy policy
ConnectLinkedIn

© Norwegian Energy Partners All Rights Reserved

NORWEP
AboutContactPlans
EventsMarketsTechnologiesPartners