Cranemaster
Cranemaster

TP Installation

Unique value proposition (UVP)

The Cranemaster Unit will enable safe and controlled installation of Transition Pieces (TPs) from floating vessels by:

  • Increasing vessel stabilityduring TP landing
  • Enabling gradual load transferonto the monopile, significantly reducing rapid vessel heeling
  • Stabilizing the TP positionafter landing on the monopile
  • Providing Lock & Release functionality, minimizing the required lifting height above the vessel deck

Key Benefits

  • By compensating for heave motions, Cranemaster allows the use of floating vessels instead of expensive jack-up vessels, cutting installation costs for transition pieces by a significant margin.
  • The technology boosts operational uptime by ensuring stable installations in rough sea conditions, effectively minimizing delays caused by adverse weather.
  • Cranemaster enhances safety during installation by maintaining consistent rigging tension, reducing the risk of accidents due to vessel movement.

Other technologies by this company

Offshore Wind

Controlled Shock Loads During Pile Run

Cranemaster
TRL 9
Offshore Wind

Controlled Loads Through the Splash Zone

Cranemaster
TRL 9
Oil & Gas

Platforms, floating production systems and onshore plants

+2 more categorizations

Cranemaster passive heave compensators and shock absorbers

Cranemaster
TRL 9
Oil & Gas

Marine operations and subsea services · Seabed installation

+1 more categorization

Shock absorbers and passive heave compensators

Cranemaster
TRL 9
Oil & Gas

Marine operations and subsea services

+1 more categorization

Passive Heave Compensation

Cranemaster
TRL 9
Oil & Gas

Vessels, rigs and modules

+1 more categorization

Cranemaster shock absorbers and passive heave compensators II

Cranemaster
TRL 9
Oil & Gas

Subsea equipment and services

+1 more categorization

Cranemaster Shock absorbers and passive heave compensators I

Cranemaster
TRL 9
Offshore Wind

Offshore installation

Shock absorber for pile-run protection

Cranemaster
TRL 9

Protection of crane and rigging during pile hammering

Cranemaster
TRL 9

Company contact

Espen Boseth Johansen
CEO
espen@cranemaster.com+47 458 68 899

TRL scale

9
DevelopmentTech demoMature

Categories

No categories.

References

  • Cranemaster heave compensator
Norwegian Energy Partners
PrivacyPrivacy policy
ConnectLinkedIn

© Norwegian Energy Partners All Rights Reserved

NORWEP
AboutContact
EventsMarketsTechnologiesPartners